Questionnaire
Transkript
Questionnaire Pøepeøská 210 511 24 Turnov Czech Republic tel.: +420 - 481 - 350 195 tel./fax: +420 - 481 - 350 196 - 322 572 e -mail: [email protected] web: www.markus-trading.cz Questionnaire System of plunger up/down control with EPS 215 valves Machine producer and type: ........................................................................................ Type of machine timing system: .................................................................................. Please, circle appropriate answers bellow: sPosition of connector (Pict 3&4): A sManometers (Pict.3) on valves (not for A position) are required: B C D E Yes No sDistribution plates(Pict.4) or air manifold (Pict.5) are requested: Yes No If yes, please send us dimensions replacing red question marks in a drawing No.1 or 2. Check carefully given dimensions. Note: Pressure air supply piping (G 2") for the air manifold delivered by Markus Trading will be made by the customer sHand of a control panel (Pict.8) and its height from the floor: LH RH sBuilt-in panel (Pict.9&10), please specify space available in uprights (mm): width (min. 200) ............... height ................. depth ................ sManual plunger up/down switch position for each cavity: s In overhead blank side panel - are there any blinded holes? Their diameter.......... s Other position - please, send a sketch or photo with dimensions sLength of cables in m (Drawing No.831 112): sManual override ................. sTrigger signals ................. sSerial line Rs485 ................. sEP valves ................. Description Membrane Assembly Effective cross section Weight Sealing material Hysteresis Repeatability Sensitivity Response time Working medium Air and environment temperature Range of input pressure Adjustable pressure Starting signal Power supply Electric connection Software Membrane pressure regulator with control VITON Distributing plate - 4 x M6; input/output G 3/4" 2 160 mm 1.5 kg VITON 1 kP 1 kP 1 kP 20 ms Dry, filtered, not oily pressure air O 0 to 60 C 0.1 to 0.9 Mpa 0.005 - input pressure Mpa 0/24 V DC 24 V Round connector CONTACT P.P.C., RS 485 Picture 1 128 98 70 2 152 A 40 G 3/4" 45 G 3/4" Vzduchový kanál Input from air manifold 90 max. 140 G 3/4" -Výstup vzduchu z mechanizmu Exhausting air from mechanism 40 (80) C Vzduch do mechanizmu Output to plunger mechanism 32 Picture 2 A 40 (48) B 128 D Picture 3 E Picture 4 Existing machine platform Deska pro stroje Emhart Plate for Emhart machines G 3/4" G 3/4" Pùvodní vzduchový kanál Original air manifold Picture 5 Existing machine platform Vzduchový kanál min.80 x 80 mm Air manifold min. 80 x 80 mm G 3/4" G 3/4" Drawing No.1 20 DISTRIBUTION PLATE 200 100 120 170 ? Drawing No.2 AIR MANIFOLD ? ? ? ? ? Minimální prostor pro výmìnu ventilu shora Minimum area for valve exchange from above min. 220 min. 200 ? Picture 8 STANDARD Hloubka panelu = 255 mm Depth of panel = 255 mm 700 Boènice stroje Machine upright 500 80 Ovládací panel ventilù pro 6-ti a 8-mi sekèní stroj-levý (pravý-zrcadlový obraz) Control panel for valves for IS6 to IS 8 m/c - LH (RH oposit) Pro 10-ti a vícesekèní stroj musí být panely dva (levý a pravý) For IS10 and more there must be two panels (LH+RH) Picture 9 OPTION Picture 10 Pøíklady integrace ovládání ventilù do boènic dle potøeb zákazníka Samples of build in panels regarding customer's need Picture 6 Ventil v plošinì - nový stroj Valve in m/c platform - new m/c Picture 7 Ventil v plošinì - modernizace staršího stroje Valve in m/c platform - modernisation of existing m/c
Podobné dokumenty
PNT800L-PC
2. NEPROVÁDĚJTE žádné úpravy na nástroji. Případné úpravy nástroje budou mít za následek
neplatnost všech aplikovatelných záruk a mohou vést k poškození nástroje nebo poranění uživatele.
3. Odpojte...
PNT800A - JK Schrauben
neplatnost všech aplikovatelných záruk a mohou vést k poškození nástroje nebo poranění uživatele.
3. Odpojte přívod vzduchu při nastavování, údržbě nebo odstraňování některé části nástroje.
4. Opra...
Doporučený postup na sestavení SGV
3. Høídel s pružinou
4. Hor. Vedení + C profil
5. Motor + dráha motoru
6. Ocelové lanka
7. Panely
8. Nastavitelná pásovina
tepelná čerpadla fairland
Tepelná čerpadla FAIRLAND zajišťují oproti tradičním metodám vyhřívání bazénů značné energetické úspory. Využívají tepelnou energii
získávanou z okolního vzduchu a pomocí výměníku v tepelném čerpa...
interior set - KPM Bratislava
Díly ohnuté popø. pokroucené vlivem teplotních zmìn a stárnutí materiálu,
mohou být narovnány do poadovaného tvaru pomocí proudu teplé vody
nebo vzduchu (fén na vlasy).
Parts slightly distorted an...
zde (pdf - 3,9 MB)
45 minutes test at the production line plus next 3 % of all produced
heat pumps go thru long therm test.
Heat pums FAIRLAND are not only sawing your money but also the
enviroment, because more than...
SGV 04 SL -připravenost pro sekční garážová vrata
Stavební pøipravenost:
následující schéma øešení a kabeláe je pouze orientaèní
veškeré rozmìry a typy pouitých kabelù Vám sdìlí naši
obchodní zástupci pøímo u Vás v místì montáe - tuto
slubu Vá...