Návod na instalaci
Podobné dokumenty
MPSV 100, 160W/m2
Cover the mat with a concrete layer up to the required height. After concreting is finished, measure the resistance values again and record them in the certificate of warranty. Wait at least 28 day...
VíceNávod na instalaci topných rohoží LD
mat on the floor. Roll the mat up again. Create “pockets” in the base material where you will place the connections for the heating and non-heating components. Clean the concrete area, remove any s...
Více