Výroba, přenos a distribuce elektrické energie
Transkript
Generation, transmission and distribution of electric power 1. SZT Komořany (today United Energy a.s.) 6kV substation ČEZ, a.s., Počerady Power Plant Desulphurization of units 2,3,4 1. SZT Komořany Reconstruction of cooling circuit 1. SZT Komořany a.s. (today United Energy a.s.) 2000-2001 Reconstruction of 6kV substation SČE a.s. – Chotějovice Reconstruction of 35kV substation Teplárna Ústí nad Labem Reconstruction of 6kV substation United Energy a.s. Reconstruction of R6 MOLI / 6kV substation United Energy a.s. Reconstruction of R04 KYII / 0.4kV substation Středočeská energetická a.s. Overhaul of R 110kV substations in the area of RD North from ED STE VE Štěchovice – ČEZ, a.s. Reconstruction of electric HV, LV equipment after flooding TR Chotějovice – SČE, a.s. Automatic equipment for inductor tuning SČE, a.s. Overhaul of Výškov 22kV substation Siemens s.r.o. Installation of 22kV substation: R 22 Ústí – North, stage II Středočeská energetická a.s. TR 110 Týnec – construction of bays 19-21 ABB s.r.o. R 110 Strakonice – new encased JČE substation ABB s.r.o. Additional equipment for encased substation 110/22kV Červený Vrch (PRE) ČEZ, a.s. Dalešice Hydroelectric Power Plant – overhaul of TG 4 – electric part United Energy, a.s. Reconstruction of 110kV substation: Stage I Středočeská energetická a.s. SP Energocentrum Kralupy – reconstruction of 22kV switching substation ČEZ a.s., Elektrárna Ledvice TG2 – repair of VHV surge arresters ČEZ, a.s., Chvaletice Power Plant Reconstruction of 110kV substation ČEZ a.s. – Mělník Power Plant R110 – reconstruction of V907 / V908 (110kV) feeder bays ČEZ a.s. – Mělník Power Plant (EMĚ I) Innovation of instrument transformers at R110 – stage Ietapa ČEZ a.s. – Poříčí Power Plant TG3 : supply and installation of generator switch ČEZ a.s. – Prunéřov II Power Plant R420 – replacement of 420kV disconnectors ČEZ a.s. – Prunéřov II Power Plant R420 – sales measuring of 420kV / V466 line 1997 1997 1999 2000-2001 2001 2002 2002-2003 2002 2002-2003 2002 2002 2002-2003 2003 2003 2003 2003-2004 2003-2004 2004 2004 2004-2005 2005 2005 2005 2005 2005 1 SIEMENS s.r.o. 2005 R110 Líšnice – replacement of 110kV breakers for transformer fields TENEL ČR s.r.o. 2005 Tisová Power Plant: reconstruction of TG3 excitation United Energy, a.s. 2006 Reconstruction of 110kV substation: stage IIetapa United Energy, a.s. 2006 TG20 – Frequency converter delivery and installation for condensate pump ČEZ a.s. – Hodonín Power Plant 2006 Replacement of instrument transformers at R110 – stage IIIetapa SE - ZVN s.r.o. 2006 TR Řeporyje – installation work during reconstruction of R400 ABB s.r.o. 2006 VEDA / TG3 – replacement of generator breaker United Energy, a.s. 2006 Compressor room / cooling water: electric and M&R part ČEZ a.s. – TR110 Jindřichov 2006 Reconstruction of 110kV substation ČEZ a.s. – Mělník Power Plant 2006 Modernization of T19 transformer ČEZ a.s. – Mělník Power Plant (EMĚ II) 2006 Reconstruction of R6-9 unit substation SIEMENS s.r.o. 2006 R110 Líšnice – replacement of 110kV breakers for line bays ČEZ a.s. – Chvaletice Power Plant 2006 Renewal of insulation of 110kV substation United Energy, a.s. 2006 Monitoring of 6kV substations: stage Ietapa Invelt elektro s.r.o. 2006 Restoration of back-pressure TG20 plant at TKY ATLAS COPCO s.r.o. 2006 Reconstruction of compressor plant at TKY ČEZ a.s. – Dalešice Power Plant 2006 TG2 overhaul: electric part + control and management system invelt elektro s.r.o. 2006 Reconstruction of MOLI exchanger station + starting oil pump at TKY : electric and M&R part SIEMENS s.r.o. 2006 - 2007 R110 Chudeřice – construction of new 110kV substation AMIKRO s.r.o. (United Energy a.s.) 2007 Retrofitting of boiler unit K06 at TKY: electric part UPS Servis, s.r.o. 2008 TG5 – superior turbo-set control at TKY ČEZ Distribuce a.s. – R35 Labe 2007-2008 Reconstruction of 35kV substation ČEZ Distribuce a.s. – TR110 Kolín East 2007-2008 Reconstruction of 110kV substation United Energy, a.s. 2007-2008 Replacement of central source UPS in TKY United Energy, a.s. 2007-2008 Monitoring of 6kV substations: stages II + IIIetapa ČEZ a.s. – Poříčí Power Plants 2007-2008 Reconstruction of 6kV substations – R6.0 and R6.1 ČEZ a.s. – Mělník Power Plant 2007-2008 Modernization of T20, 110/6kV transformer United Energy, a.s. 2008 2 Reconstruction of 110kV substation: stage IIIetapa TENEL s.r.o. 2008 Tisová Power Plant – reconstruction of TG2 field system United Energy, a.s. 2008 Replacement of FM for CHČ7 (500kW) cooling pump EGE montáže s.r.o. (ČEPS, a.s.) 2008 TR420 – replacing equipment in V438 bay ČEZ a.s. – Poříčí Power Plants 2008-2009 Reconstruction of sales and balance measuring KLEMENT a.s. 2008-2009 Ledvice Power Plant – electric installation of the coal handling unit ČEZ a.s. – Dvůr Králové Heating Plant 2009 Repair of TG1 cable outlet ČEZ a.s. – Dvůr Králové Heating Plant 2009 Reconstruction of sales and balance measuring ČEPS, a.s. 2009 R420 Horní Životice – replacement of instrument transformer in ACA04 bay ŠKODA PRAHA Invest s.r.o. (ČEZ, a.s.) 2008-2009 OB_34.3 - electric part Ledvice Power Plant, water treatment plant and coal handling system for 660 MW unit ČEZ a.s. – Chvaletice Power Plant 2009 Reconstruction of the power supply part of the common 6kV substation ČEPS, a.s. 2009 TR Malešice – reconstruction of switchgears for auxiliaries Teplárna Trmice a.s. 2009 Backup supply for BIOETHANOL Trmice ČEZ a.s. – Dalešice Power Plant 2009-2010 TG1 – replacement of generator breaker ZAT a.s. (ENERGO PRO CZ s.r.o.) 2009-2010 Reconstruction of MVE Small Hydroelectric Plant – electric part ALSTOM s.r.o. 2010 DENOx / EPR2 – reconstruction of fan mills: electric and M&R part ČEZ a.s. – Prunéřov 2 Power Plant 2010 B22 – replacement of generator breaker ČEPS, a.s. 2010 TR Nošovice – replacement of 400kV breakers in ACA04, ACA08 bays MAPRO s.r.o. 2010 Ševětín Photovoltaic Power Plant – construction of 110kV, 22kV substation and auxiliaries ČEZ a.s. – Poříčí Power Plants 2010 Frequency converters of primary fans FK7 and FK8 invelt elektro s.r.o. 2010 Reconstruction of TG21 protections at TKY ATLAS COPCO s.r.o. 2010 Enlargement of compressor station at TKY (KM4) ISTAR s.r.o. 2010 FVE Žíželice – 22kV service line and distribution system ŠKODA PRAHA Invest s.r.o. (ČEZ, a.s.) 2009-2010 OB_64.03 – temporary installations for stage 4 in Ledvice Power Plant United Energy, a.s. 2010 Replacement of KYI rectifiers at TKY Teplárna Trmice a.s. 2010 ČS Labe – reconstruction of 6kV substation stage 1 ČEZ Distribuce a.s. – TR110/22 Slaný 2009-2011 Reconstruction of 110/22kV transformer station ČEZ a.s. – Dvůr Králové Heating Plant 2010-2011 Reconstruction of 6kV and 35kV substations 3 ČEZ a.s. – Chvaletice Power Plant Reconstruction of the common 6kV substation - outlet part Teplárna Trmice a.s. ČS Labe – reconstruction of 6kV substation stage 2 ČEZ ICT Services, a.s. Implementation of EPC optimization system NOEN, a.s. EPRU II – supply and installation of temperature distribution boards for coal ČEPS, a.s. TR Nošovice – adding measuring sections for HUS ŠKODA POWER s.r.o. ELENZ – project, supply and installation of cables for OB04 (machine room) ČEZ a.s. – Dvůr Králové Heating Plant Complete supply and installation of EN United Energy a.s. R6MOLI – arc protection replacement UNIREC s.r.o. (ČEZ, a.s.) Electric heating for drinking water piping to AB ČEZ Distribuce a.s. – TR110 Hrádek Connecting of 32MW Václavice Wind Power PLant ČEZ a.s. – Chvaletice Power Plant Reconstruction of 6kV substation excavating station ČEZ a.s. – Prunéřov 2 Power Plant B21 – replacement of generator breaker United Energy a.s. Replacement of frequency converter in CHČ2 cooling pump invelt elektro s.r.o. Reconstruction of TG21 turbine set at TKY V-systém elektro s.r.o. Strakonice Heating Plant – installation of heating cables United Energy a.s. FM installation for EN2 electric feed pump Teplárna Trmice a.s. Repair of 6kV – R6K5 HV switchboard 2011 2011-2012 2011-2012 2011-2012 management 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012-2013 2012-2013 Chemical industry Chemopetrol , a.s. Litvínov – new Air Separation Plant 1997 10kV substation Chemopetrol, a.s. Litvínov – T700 Power Plant Desulphurization ABB EJF a.s. – Chemopetrol, a.s. Litvínov Monitoring system Schneider Electric CZ s.r.o. – Chemopetrol, a.s. Litvínov Encased 110kV substation Invelt Energo – SETUZA a.s. Generator outlet AIR PRODUCTS Litvínov Construction of new oxygen plant – electric part Louka u Litvínova – ABB s.r.o. Praha Construction of magnesium recycling plant Lovochemie, a.s. Replacement of auxiliaries transformers 6/0.4kV 1997 1998 1999-2000 2000 2001-2002 2001 2001 4 Construction of nitric acid plant KD 6 – Off-Site: Lovochemie, a.s. 6kV substation AIR PRODUCTS Litvínov LV and HV part – 5MW oxygen compressors 2001-2002 Lovochemie, a.s. Overhaul of electric equipment of LAV II plant (neutralization) Lovochemie, a.s. Raking machine LAV North: Overhaul of electric equipment Lovochemie, a.s. Reconstruction of HV, LV electric equipment after flooding Kaučuk, a.s. T100 – output increase (transformers 110/6.3kV, 40MVA) Kaučuk, a.s. Ethyl benzene II – OSBL – drawing offspec: LV part Lovochemie, a.s. Reconstruction of 6kV substation: R 81 (ÚLV) Spolana Neratovice a.s. Reconstruction of 6kV substation: R 82 (waste water treatment plant) Kaučuk, a.s. Reconstruction of TR 213, 6kV transformer station EGÚ České Budějovice s.r.o. Breaking programme at Kaučuk, a.s. – 6kV substation Lovochemie, a.s. Reconstruction of 6kV substation: R91 (ÚV) Chemoprojekt, a.s. SETUZA, a.s. – glycerin production: electric part Lovochemie a.s. Replacement of wiring on scaffold bridge – fuel hopper TENEL ČR s.r.o. Chemopetrol, a.s. : reconstruction of TG12 and TG14 excitation Lovochemie, a.s. Reconstruction of 6kV substation: R21 (HSS) Lovochemie, a.s. Replacement of compensation inductors for T101 and T102 ABB s.r.o. Chemopetrol – repair of R200 6kV substation: POX power supply SKANSKA a.s. Intensification of the filling station in Klobouky MERO, a.s. Chemoprojekt, a.s. FAME Ústí nad Labem – power current distribution systems: electric part TENZA a.s. Utility main for bio-fuels – power supply 22kV BIOETHANOL TRMICE Construction of HV, LV substations and technology Lovochemie, a.s. Reconstruction of 6kV substation: R28 (pumping station) MERO a.s. Intensification of the filling station in Nové Město Chemoprojekt, a.s. Bio-diesel production plant MEROCO - Leopoldov: electric part TENEL s.r.o. Chemopetrol - reconstruction of the field systems TG2 and TG9 ABB s.r.o. KORADO Ústí nad Orlicí - replacement of 22kV disconnectors Lovochemie, a.s. 2002 2002 2002 2002 2002-2003 2002-2003 2002-2003 2003 2003-2004 2003 2004 2005 2005 2005 2006 2006 2006 2006 2006-2007 2007 2007 2007 2007-2008 2007-2008 2007-2008 2008 2008 5 Reconstruction of 6kV substations: SUPERFOSFÁT and NPK Chemoprojekt, a.s. FAME PREOL Lovosice – power current distribution systems: electric part MERO a.s. Intensification of the filling station in Velká Bíteš DALKIA ČR a.s. Bioethanol – connecting backup supply at 22kV level MERO a.s. CTR Nelahozeves – replacement of 110kV breakers MERO a.s. CTR Nelahozeves – modernization of main 6kV substation Lovochemie, a.s. Switchover of transformers LAV3 to R21 substation - HSS MERO a.s. Inspection of steel structures of 110kV line towers Lovochemie, a.s. Reconstruction of 6kV substations: R11 and R19 Lovochemie, a.s. Reconstruction of Lime Mill – electric part MERO a.s. Modernization of energy consumption reader at Central Oil Pumping Station ABB s.r.o. (UNIPETROL a.s.) TS of Energetika plant – replacement of HV switchgear protections UNIPETROL RPA s.r.o. R200 – reconstruction of earth transformers with inductors Lovochemie, a.s. ÚLV – complete supply of vertical pump UNIPETROL RPA s.r.o. R200 – replacement of station batteries DITHERM a.s. (Synthos Kralupy, a.s.) Reconstruction of computation technology halls UNIPETROL RPA s.r.o. Supplementation of source state in TS5833 and TS6419 – HR6 Chemoprojekt, a.s. Design work – ORICA Trident / Australia MERO a.s. Roofing KZ at PC28 Nové Město: electric part 2008-2009 2008-2009 2009-2010 2010 2010 2010 2010 2011 2011 2012 Nelahozeves 2011-2012 2012 2012 2012 2012 2013 2012-2013 2012-2013 Mines Severočeské doly a.s., Nástup Tušimice Mines Reconstruction of 110kV substation (stage I)etapa) Severočeské doly a.s., Nástup Tušimice Mines Electric installation work – conveyor transport Severočeské doly a.s., Nástup Tušimice Mines Electric installation work – KU 300 Severočeské doly a.s., Bílina Mines Reconstruction of 110kV substation Severočeské doly a.s., Nástup Tušimice Mines Reconstruction of 110kV substation (stage II)etapa) První elektro a.s. TR II – Nástup Tušimice Mines: reconstruction R110 První elektro a.s. Overhaul of KU 300/29 : Nástup Tušimice Mines 2000 2000 2000 2001-2003 2001 2003-2004 2003 6 První elektro a.s. Overhaul of KU 300/26 : MUS, a.s. – ČSA Mine MUS, a.s. Reconstruction of LV substation in building 2355 / ČSA Mine 2004 2004 MUS, a.s. 2004 Replacement of voltage controllers at 110 / 35kV transformers: ČSA Mine Severočeské doly a.s., Bílina Mines 2005 Reconstruction TR1 – transfer of control to PC MUS a.s. 2005 R35 HERKULES – Reconstruction of 35kV substation Severočeské doly a.s., Bílina Mines 2008 Reconstruction of TR3 – Project Documentation Severočeské doly a.s., Bílina Mines 2008 Modernization of TR211 – DNT substation SD – 1.strojírenská, a.s. 2008 TR1 - reconstruction of 35kV substation: stage 2 PRODECO, a.s. 2008 SD - 35kV line relay: V12 to DNT MUS a.s. 2008 R110 Líšnice – replacement of KMT in transformer bays Severočeské doly a.s., Bílina Mines 2009 Reconstruction of HV substations for conveyor transport SOUTH Severočeské doly a.s., Bílina Mines 2009 Reconstruction of protections for VSS – project documentation SD – 1.strojírenská, a.s. 2009 TR1 - reconstruction of 35kV substation: stage 3 Severočeské doly a.s., Bílina Mines 2009 Reconstruction of Protections for VSS Czech Coal Services, a.s. 2009 R110 Líšnice – replacement of KMT in the line bays Czech Coal Services, a.s. 2009 R6 Raking Device – reconstruction of HV substations Czech Coal Services, a.s. 2009 R6 ČSA – reconstruction of HV, LV distribution systems SD – 1.strojírenská, a.s. 2010 TR1 - reconstruction of 35kV substation: stage 4 SD – 1.strojírenská, a.s. 2010 Test room – reconstruction of 4 bays of HV substation Severočeské doly a.s., doly Bílina 2008-2011 Reconstruction of TR3 transformer station Palivový kombinát Ústí nad Labem, s.p. 2010 Change of power supply to wall technology factory building and waste water treatment plant PRODECO, a.s. (Severočeské doly a.s., Bílina Mines) 2010-2011 Construction of wheel excavator KK1300: electric part and control and management system PRODECO, a.s. (Severočeské doly a.s., Bílina Mines) 2010-2011 Construction of new long-haul DPD B=1600 mm V1, V2, V3 conveyor line Coal Services, a.s. 2010-2011 R110 Líšnice – replacement of VHV glands in transformer bays Severočeské doly a.s., Bílina Mines 2011 TR ÚUL - remote breaking of 500V outlets Severočeské doly a.s., Bílina Mines 2011 Renewal of visualisation equipment in ÚUL central control room PRODECO, a.s. (Severočeské doly a.s., DNT) 2011 7 Construction of transformer station DT 35/6kV for power supply to 3.SŘ (DT64) Severočeské doly a.s., DNT 2011 6kV cable route for spreader and removing conveyors, Libouš Quarry SD – 1.strojírenská, a.s. 2011 Reconstruction of substation for Main Pumping Station II NOEN, a.s. 2011 BD coal supply system ADULARIA - Yunus Emre 2x145MWe, Turkey Elektroprim Koutník, a.s. (Severočeské doly a.s., Bílina Mines) 2011-2012 Construction of four DT 35/6kV transformer stations for Northern Slopes (TS77, 78, 79, 80) Coal Services, a.s. 2011 R35 Líšnice – replacement of HV 35kV breaker Severočeské doly a.s., Bílina Mines 2011 Modernization of visualisation and CS at ZP 10000/Z81L Severočeské doly a.s., Bílina Mines 2011 Modernization of visualisation and CS at ZP 5500.5/Z79 Severočeské doly a.s., Bílina Mines 2011 Repair of inclinometer and evaluation unit at Z79 spreader PRODECO, a.s. (Severočeské doly a.s., Bílina Mines) 2012 Excavator KK1300 – adding impact antenna Elektroprim Koutník, a.s. (Severočeské doly a.s., Bílina Mines) 2012 Supply of control system for TV300 transport vehicle PRODECO, a.s. (Severočeské doly a.s., Bílina Mines) 20112012 Reassembly of long-haul conveyor 1200a 1600 mm on Southern Slopes DB - construction project B Coal Services, a.s. 2012 Replacement of 35kV substation - Kopisty SIEMENS s.r.o. (Severočeské doly a.s., Bílina Mines) 2012 Construction of two PD172, PD174 substations Severočeské doly a.s., Bílina Mines 2012 Reconstruction of 500V bays at DKU, HD and HT – CS part Severočeské doly a.s., DNT 2012 Modernization of DAP tensometric equipment on stripping excavators Severočeské doly a.s., Bílina Mines 2012 Reconstruction of protections at DT75, DT76 transformer stations Severočeské doly a.s., DNT 2012 Reinforcement of pumping equipment ČS 3/7 Libouš – south instrument transformer Severočeské doly a.s., Bílina Mines 2012 Repair of dashboard PC in K98 machine cabin Severočeské doly a.s., Bílina Mines 2012 Repair of readout of caterpillar turning at K101 machine Severočeské doly a.s., DNT 2012 Digger K800/N2 – K104 : Lift and turn modernisation Coal Services, a.s. 2012 Signalling of HV switching stations into information system Coal Services, a.s. 2012 Monitoring of 35kV Herkules switching station Elektroprim Koutník, a.s. (Severočeské doly a.s., Bílina mines) 2012-2013 Construction of six PD substations for Northern Slopes (PD921 to PD926) Severočeské doly a.s., DNT 2012-2013 Construction of new coal outlet 3 - Tušimice ARKO TECHNOLOGY, a.s. (Severočeské doly a.s., Bílina mines) 2012-2013 Extension of existing Emerán mine water purification works – electrical part, I + C and control system Severočeské doly a.s., DNT 2012-2013 8 Modernisation and refit of belt conveyor PD 275, PÚ Lom - UO II Severočeské doly a.s., Bílina Mines Inspection and repair of CS communication network on Z102 spreader SIEMENS s.r.o. (Severočeské doly a.s., Bílina Mines) PD502 and 506 commissioning – 2nd overburden cut PRODECO, a.s. (Severočeské doly a.s., Bílina Mines) Preparing RPD for CS and PVZ2500P controlled drives for DB SIEMENS s.r.o. (Severočeské doly a.s., Bílina Mines) Including SICK weigher in the control system První Elektro, a.s. (Severočeské doly a.s., Bílina Mines) K650/K108 control system modification 2013 2013 2013 2013 2013 Other industries Škoda Auto a.s. Mladá Boleslav 1999-2000 Reconstruction of 110kV substation Rükl a syn – Otvovice 1999 Reconstruction of glass melting tank - realization of electric part Schaeffler GmbH – Bor u Tachova 2000 22kV substation construction Factory building Schaeffler GmbH – Bor u Tachova 2000 Wiring Schoeller Litvínov k.s. 2000 22kV substation Velveta a.s., Varnsdorf 2000 Reconstruction of 35kV substation Ústav jaderného výzkumu Řež u Prahy 2000 Reconstruction of 22kV distribution systems Crystalex a.s Hostomice – Teplotechna Prima s.r.o. 2001 Reconstruction of factory building Škoda Auto a.s. Mladá Boleslav 2001 Reconstruction of 22kV substation Škoda Auto a.s. Mladá Boleslav 2001 Repair of LV and HV distribution systems Všebořice – Škoda Auto a.s. Mladá Boleslav 2001 Reconstruction of 22kV transformer station Škoda Auto a.s. Mladá Boleslav 2002-2004 R110 / E25: replacement of disconnectors M. Ward Manufacturing, s.r.o. 2002-2003 22kV service line and 22/0.4kV transformer plant STONE s.r.o. 2003 Reconstruction of TR 35/0.4kV incl. LV part KAJIMA EUROPE B.V. 2003 SUMIKEI Czech New Factory – electric part ALCES s.r.o. 2003 Reconstruction of ČTK building (Opletalova 5-7): electric part, LV, HV substation CELIO a.s. 2003 Construction and connecting of cogeneration units VA TECH WABAG s.r.o. 2003-2004 Reconstruction of chemical water treatment plant at TKY: electric part, M&R and system of controlling of technology processes ŠKO-ENERGO s.r.o. 2003 Replacement of cables for T6 – T12, 22kV transformers ŠKODA AUTO a.s. 2003-2004 Reconstruction of 22kV substations: E25, M12B, M3 and M10 ŠKO-ENERGO s.r.o. 2003-2004 9 Switchover of HV 22kV, R22 / M6 and R22 / Z52 substations ŠKO-ENERGO s.r.o. Replacement of connecting cables of E25-R22 / STE (ROBO) substation TESYCO GROUP a.s. Reconstruction of 22kV substation: E25 in Škoda Auto, a.s. Alcan Děčín Extrusions s.r.o. Repair of fire safety system on cable distribution system ŠKO-ENERGO s.r.o. Replacement of 6kV substation: E14 GLAVERBEL CZECH a.s. R35 – replacement of protections, signalling of earth connection 2003-2004 2004-2005 2005 2005 2005 Procter Gamble s.r.o. 2005 Supply and assembly of HV compensation switchgear SORG GmbH 2006 KNAUF Krupka – glasswork melting unit: electric part AQUA-STYL a.s. 2006 ŠKO-ENERGO Heating Plant / Unit 90 – installation of frequency converter in condensate pump ŠKO-ENERGO s.r.o. 2006 Replacement of 22kV switchgear: E14 EMCOS s.r.o. 2006 AGC Chudeřice / R14 substation - connecting NCx plant ALCAN Děčín EXTRUSIONS s.r.o. 2006 Transformer station B – replacement of the main 500 V switchgear Měď Povrly a.s. 2006 Foundry – 22kV supply, installation of shop floor technology TESYCO GROUP a.s. 2006 Reconstruction of 22kV substation: H2B ve ŠKODA AUTO, a.s. ŠKODA AUTO a.s. 2006 Reconstruction of the distribution network protection 22kV (MICROSCADA) – stage Ietapa AGC Automotive CZECH a.s. 2006-2007 Construction of glass-melting tank 35/ 0.4kV AQUA-STYL a.s. 2007 ŠKO-ENERGO heating plant / unit 80 – addition of heating condensate pump ALCAN Děčín EXTRUSIONS s.r.o. 2007 Transformer station C – replacement of the main 500 V switchgear SD – 1.strojírenská, a.s. 2007 TR1 - reconstruction of 35kV substation: stage 1 Měď Povrly a.s. 2007 Kontilití JATAM – reconstruction of the control part of the line ŠKODA AUTO a.s. 2007-2008 Reconstruction of the distribution network protection 22kV (MICROSCADA) – stage IIetapa ŠKO-ENERGO s.r.o. 2008 Connection of 6kV compressors in E14 ALCAN Děčín EXTRUSIONS s.r.o. 2008 Relocation of transformer station A – 10kV, 500V, 400V ŠKO-ENERGO s.r.o. 2008 Replacement of TK4 compressor switchgear in Building E14 DALKIA ČR a.s. 2009 OC Fórum: Power supply for cooling plant – electric part ŠKO-ENERGO s.r.o. 2009 Replacement of Disconnectors 22kV – Josefův Mine, Bradlec ŠKO-ENERGO s.r.o. 2009 E5 Building – connection of air dryers TESYCO GROUP, a.s. (ŠKODA AUTO a.s.) 2010 10 M12B – replacement of cabling for TR1, TR2, TR3 ŠKO-ENERGO s.r.o. 2009 M12A Building – reconstruction of transformer stations ŠKO-ENERGO s.r.o. 2008-2010 Z5 Building - reconstruction of LV and HV substations ŠKODA AUTO a.s. 2010 Reconstruction of the distribution network protection 22kV (MICROSCADA) – stage IIIetapa ŠKODA AUTO a.s. 2010 Reconstruction of 22kV distribution network protection (MICROSCADA) – stage IV ALCAN Děčín EXTRUSIONS s.r.o. 2010 Extending HV switchgear in transformer station D Schneider Electric CZ s.r.o. 2010-2011 WTP Chánov - reconstruction of HV and LV substation ŠKODA AUTO a.s. 2010-2011 Reconstruction of 22kV distribution network protection (MICROSCADA) – stage V ALCAN Děčín EXTRUSIONS s.r.o. 2011 Replacement of surge arresters in 110kV substation TESYCO GROUP, a.s. (ŠKODA AUTO a.s.) 2011-2012 M1, M2 – reconstruction of power supply to substations ŠKO-ENERGO s.r.o. 2011 Z6 building – replacement of motor starters for pumps ŠKODA AUTO a.s. 2011 Repair of M1C, M2C substation controls ŠKODA AUTO a.s. 2011 Reconstruction of 22kV - E28 substation protections ŠKODA AUTO a.s. 2011 Reconstruction of direct current sources in 22kV substations MONDI Štětí a.s. 2011 Installation of heating cables on piping systems ŠKO-ENERGO s.r.o. 2012 E14 Building – replacement of VO switchgear Kolbenschmidt Czech Republic, a.s. 2012-2013 Transformer station 35/0.4kV – reconstruction of 35kV switching station ŠKO-ENERGO s.r.o. 2013 M12A Building – change of T1 and T10 transformers Constellium Extrusions Děčín s.r.o. 2013 Repair of r4-10kV switchgear in transformer station "C" TESYCO GROUP, a.s. (ŠKODA AUTO a.s.) 2013 Česana premises / Packet 1.1 - 22kV switching substation Export Sklárna Rasko, Anopino (RUSKÁ FEDERACE) Installation of HV, LV wiring Frankenluk GmbH Messe München (SRN) 0.4kV substations – wiring installation Frankenluk GmbH Bosch Stuttgart (SRN) 0.4kV substations – wiring installation Frankenluk GmbH Bosch Bamberg (SRN) 0.4kV substations – wiring installation Sklárna Rostov n/D (RUSKÁ FEDERACE) Installation of HV, LV wiring Frankenluk GmbH – Munich Airport (FRG) 2000 2000 2000 2001 2001-2002 2001-2002 11 Construction of substations for airport terminal 2 SIEMENS A.G. BMW FIS München: installation of 22kV substations TE4 – Ulaanbaatar / Mongolia Reconstruction of fuel tipper B – electric part TE4 – Ulaanbaatar / Mongolia Reconstruction of fuel tipper A – electric part ZAT, a.s. TALKHA / Egypt - service work - CS Diamo SK TE4 – Ulaanbaatar / Mongolia TE4 Power Plant - service work on coal handling system CS 2003-2004 2009 2010 2011 2011-2012 Summary of orders currently in progress ŠKODA PRAHA Invest s.r.o. (ČEZ, a.s.) 2009-2014 OB_33.3 – power outlet in Ledvice Power Plant ABB s.r.o. (ČEZ, a.s.) 2010-2014 OB_34.4 – installation and supply work for Ledvice Power Plant EGEM s.r.o. (ČEZ, a.s.) 2011-2013 OB_09.3 - power outlet and exterior substation for PPC Počerady ABB s.r.o. (ČEZ, a.s.) 2011-2013 OB_09 - installation and supply work for PPC Počerady KLEMENT, a.s. 2011-2013 OB_09 – wiring for desuplhurization technology in Ledvice Power Plant KLEMENT, a.s. 2011-2013 OB 10.1 - internal management of power generation by-products in Ledvice Power Plant KLEMENT, a.s. 2011-2013 OB 10.2 - external management of power generation by-products in Ledvice Power Plant ČEPS, a.s. 2011-2014 TR Albrechtice – maintenance of power equipment EGEM s.r.o. (ČEPS, a.s.) 2011-2015 TR Babylon - reconstruction of transformer station Czech Republic - Czech Development Agency 2011-2013 Ulaanbaatar / TE4 Power Plant - reconstruction of chemical water treatment plant ČEZ Distribuce a.s. – TR110 Babylon 2012-2014 Reconstruction of the transformer station I&C ENERGO a.s. (ČEZ, a.s.) 2012-2013 OB_34.4 – assembly work for reverse osmosis NOEN, a.s. 2012-2013 EPRU II, OB01 – coal handling: distribution board for temperature transducers TAMERO INVEST s.r.o. (Synthos Kralupy, a.s.) 2012-2013 PC3 - power output and conversions of existing 110kV switching station GENERI, s.r.o. (ČEZ, a.s.) 2012-2013 EPOČ – installation of electric heaters ČEPS, a.s. 2013 TR Milín – repair of ADA01, ADA02 switches Severočeské doly a.s., Bílina Mines 2013 Reading SM undercarriage position on Z92 SYNTHOS Kralupy, a.s. 2013 Thermal oxidation unit with heat regeneration (RTNV) APEK Praha s.r.o. (United Energy a.s.) 2013 Modernization of lime transport – power current part SWIETELSKY stavební s.r.o. 2013 12 OB9 – desulphurization: electric installation work on SO713 and SO714 in Prunéřov 2 Power Plant Severočeské doly a.s., Bílina Mines 2013 K2000.1/K101 – reconstruction of regulated turning device drives ŠKO-ENERGO s.r.o. 2013 Replacement of lighting in cable collectors CELIO a.s. 2013 Control room management of sources (cogeneration units) SPEL, a.s. (ČEZ, a.s.) 2013 OB10.2 / DPS32.15 – automated system of controling of technology processes: cabling and installation work United Energy a.s. 2013 R6KTII – replacement of emergency arc protection ULIMEX s.r.o. (Měď Povrly a.s.) 2013 Modernization and reconstruction of technology of cup producing plant KAREL HOLOUBEK – Trade Group a.s. 2013 Replacement of V3 and V5 disconnectors ŠKO-ENERGO s.r.o. 2013 Replacement of coupling cables in M12A, V17A, Z5 substations PRODECO, a.s. (Severočeské doly a.s., Bílina Mines) 2013 ÚUL – renewal of D8b crushing plant: electric part and automated system of controling of technology processes COFELY a.s. (ČEZ Distribuce a.s.) 2013 Liberec Heating Plant – unification of R10kV to R22kV (stage IV) Etapa) Kolbenschmidt Czech Republic, a.s. 2013 Replacement of T3, 22/0.4kV transformer ABB s.r.o. (UNIPETROL RPA s.r.o.) 2013 Modification of R100 Control Room for new panel KLEMENT, a.s. (JOTUN CZ a.s.) 2013 Installation of production lines No. 8 and 9 – Trmice Montáže Čakovice s.r.o. (ŠKODA AUTO a.s.) 2013 Replacement of HV power supply cables for Z5 station ČKD PRAHA DIZ, a.s. (SYNTHOS Kralupy, a.s.) 2013 K1 boiler burners – electric installation work CSE-CONTROLS, s.r.o. (MERO a.s.) 2013-2015 Replacement of CS on Družba Oil Pipeline and CTR MERO – electric part UNIPETROL RPA s.r.o. 2013 Reconstruction of MR69 switchgear TENEL ČR s.r.o. 2013 Bridge – supply and installation of HV cables between TG and R35kV UNIPETROL RPA s.r.o. 2013 Supply and installation of frequency converters for unit 22 MERO a.s. 2013 PC28 Nové Město – reconstruction of RM3.1 and service distribution systems HERKUL a.s. (Severočeské doly a.s., Bílina Mines) 2013-2014 ÚUL – loading of dust coal: building installation CHARMONT s.r.o. 2013 OB10.2 – external management facility of power generation by-products in ELE: electric heating systems 13 Electric maintenance United Energy, a.s. (Komořany Heating Plant) Comprehensive maintenance of electrical equipment of all voltage levels ČEZ a.s., Ledvice Power Plant Partial maintenance of electrical equipment of HV and VHV voltage levels MERO ČR, a.s. Expert maintenance and servicing of electrical equipment of LV, HV and VHV voltage levels Cray Valley Czech, s.r.o. Partial maintenance of electrical equipment of LV and HV voltage levels HV, VHV and EHV servicing Coal Services, a.s. ČEZ, a.s. – hydroelectric power plants ČEZ, a.s. – conventional power plants Dopravní podnik města Chomutov Dopravní podnik města Ústí nad Labem Dopravní podnik měst Mostu a Litvínova Energetické Opravny, a.s. ELPAK, s.r.o. HUMECO, a.s. Most Chemické závody Sokolov a.s. I&C Energo, a.s. KSK Komořany, a.s. Litvínovská Uhelná, a.s. PARAMO, a.s. Pardubice Sokolovská uhelná a.s. Sokolov SEI-MONT, s.r.o. Spolana a.s. Neratovice Spolchemie a.s. Ústí nad Labem 14 ŠKO-ENERGO a.s. Mladá Boleslav Teplárna Trmice, a.s. UNITED ENERGY, a.s. Železárny Podbrezová, a.s. 15
Podobné dokumenty
Výroba, přenos a distribuce elektrické energie
Velveta a.s., Varnsdorf
Rekonstrukce rozvodny 35 kV
Ústav jaderného výzkumu Řež u Prahy
Rekonstrukce rozvodů 22 kV
Crystalex a.s Hostomice – Teplotechna Prima s.r.o.
Rekonstrukce výrobní haly
Škoda...
Výroba, přenos a distribuce elektrické energie
Elektroprim Koutník, a.s. (Severočeské doly a.s., doly Bílina)
Dodávka řídicího systému pro transportní vůz TV300
PRODECO, a.s. (Severočeské doly a.s., doly Bílina)
Remontáže DPD 1200a 1600 mm na J...
Výroba, přenos a distribuce elektrické energie
Backup supply for BIOETHANOL Trmice
ČEZ a.s. – Dalešice Electric Power Plant
Výroba, přenos a distribuce elektrické energie
Generální oprava rozvoden R 110 kV v oblasti RD sever z ED STE
VE Štěchovice – ČEZ, a.s.
Rekonstrukce elektrozařízení VN, NN po povodních
TR Chotějovice – SČE, a.s.
Automatiky ladění tlumivek
SČE, ...
Návod k obsluze 225
INTRODUCTION
Thank you for selecting and purchasing the Cardinal Model 225 Weight Indicator. The Model
225 indicator was built with quality and reliability at our factory in Webb City, Missouri an...
SIEMENS Výrobce hliníkových vlakových souprav
has to charge the legal VAT. This VAT amount cannot be refunded. Foreign buyers
from countries not belonging to the European Community have to pay the legal VAT
as deposit to the auctioneer. After...
SIEMENS Manufacturer of Aluminium Train Bodies
Dismantling is mandatory for several lots and will be done by Intermedia
Engineering BV. The dismantling costs will be invoiced by Troostwijk Auctions
together with your purchase. In these costs ar...
Projekt diplomové práce
Taylor, L.T. (2006). Does WoW change everything?. Games and culture,2/4 38337
Williams, D. a kol. (2006). From tree houses to baracks. The Social life of guilds
in World of Warcraft. Games and cult...
referenze Media Media dal 2005 al 2010.xlsx - EL
Balfour Beatty Rail S.p.A.
ASM Voghera S.p.A.
RINGIMILL S.p.A.
RINGIMILL S.p.A.
ABB S.p.A.
Fenice S.p.A.
Enel Produzione S.p.A.
Elettrolumen S.r.l.
Cefla S.c.r.l.
Cefla S.c.r.l.
Bridi Marino