Brožura ROP 2014 - ROP Střední Čechy
Transkript
Regionální operační program Střední Čechy Regional Operational Programme for Central Bohemia 2007–2013 Přehled prioritních os SCHEME OF THE PRIORITY AXIS Prioritní osy a oblasti podpory ROP NUTS 2 Střední Čechy Priority axis and intervention areas ROP NUTS 2 Central Bohemia Prioritní osa 3 Integrovaný rozvoj území Prioritní osa 1 Doprava Prioritní osa 2 Cestovní ruch Priority axis 1 Transport Priority axis 2 Tourism Priority axis 3 Integrated Territorial Development 1.1 Regionální dopravní infrastruktura 2.1 Podnikatelská infrastruktura a služby cestovního ruchu 3.1 Rozvoj regionálních center 1.1 Regional Transport Infrastructure 2.1 Business Infrastructure and Tourism Services 3.1 Regional Centre Development 1.2 Udržitelné formy veřejné dopravy 2.2 Veřejná infrastruktura a služby cestovního ruchu 3.2 Rozvoj měst 1.2 Sustainable Forms of Public Transport 2.2 Public Infrastructure and Tourism Services 2.3 Propagace a řízení turistických destinací Středočeského kraje 2.3 Promotion and Management of Tourist Destinations of CB 3.2 Town Development 3.3 Rozvoj venkova 3.3 Rural Development Prioritní osa 4 Technická pomoc Priority axis 4 Technical Assistance 4.1 Řízení, kontrola, monitorování a hodnocení programu 4.1 Programme Management, Control, Monitoring and Evaluation 4.2 Informovanost a publicita programu 4.2 Programme Awareness and Publicity 4.3 Absorpční kapacita regionálních aktérů 4.3 Absorption Capacity of Regional Stakeholders → K čemu slouží ROP a Úřad Regionální rady? Regionální operační program Střední Čechy je určen pro čerpání finančních prostředků z fondů Evropské unie a jak z názvu vyplývá, je speciálně zaměřen na region soudržnosti NUTS II Střední Čechy (shodný s územím Středočeského kraje). Tak jako ministerstva mají na starosti tematické operační programy, regionální operační programy mají v gesci tzv. Regionální rady, resp. jejich výkonné složky Úřady Regionálních rad. Regionální operační program Střední Čechy je zaměřený na tři hlavní oblasti regionálního významu: 1.Dopravu, 2. Cestovní ruch, 3. Integrovaný rozvoj území. Hovoříme o tzv. prioritních osách, v rámci kterých můžete své projekty předložit a získat na ně dotaci. Výše dotace se určuje v závislosti na typu projektu a typu žadatele, tedy toho, kdo projekt předkládá (po schválení žádosti a podpisu Smlouvy o dotaci poté hovoříme o tzv. příjemcích podpory). Tento program také obsahuje 4 oblasti, tzv. Technickou pomoc, která je zaměřena na samotný chod úřadu, fungování a monitorování programu, publicitu a komunikaci a na podporu úspěšného čerpání finančních prostředků z EU směřovanou příjemcům podpory. Globálním cílem ROP Střední Čechy k roku 2013 bylo vytvoření podmínek pro dynamický růst HDP regionu a zajištění vysoké kvality života obyvatel měst i venkova prostřednictvím zvýšení atraktivity regionu pro bydlení, podnikání, investice a cestovní ruch. Nyní stojíme na počátku roku 2014, v závěrečné fázi programovacího období. → What is the job of ROP and the Regional Council Office? The Regional Operational Programme for Central Bohemia is intended for drawing funds from European Union funds, and, as the name suggests, its main focus is the NUTS II Central Bohemia Cohesion Region (occupying the same territory as the Central Bohemian Region). In the same way that ministries are responsible for thematic operational programmes, Regional Councils and their executive units, Regional Council Offices, administer regional operational programmes. The Regional Operation Programme for Central Bohemia focuses on three main fields of regional significance: 1.Transport, 2.Tourism, 3. Integrated Territorial Development. We talk of „priority axes“ within which you may submit your projects and gain a subsidy for them. The amount of the subsidy is determined according to the type of project and type of applicant, i.e. the entity submitting the project (on approving the application and signing the Agreement for Provision of Subsidy, we then call them beneficiaries of support). This programme also includes the fourth area called Technical Assistance, which focuses on actual operation of the office, functioning and monitoring of the programme, publicity and communication and on aiding successful sourcing of EU funds directed towards the beneficiaries of support. The global objective of the ROP Central Bohemia was to create the conditions for the dynamic growth of the region’s GDP by 2013 and to ensure a high standard of living for urban and rural residents by means of increasing the region’s appeal with regard to housing, entrepreneurship, investment, and the tourism industry. Now at the beginning of 2014 we stand at the final phase of the programming period. ROP for Central Bohemia / ROP Střední Čechy ← 3 → Evropské peníze v kraji významně pomáhají V období 2007–2013 byl pro Českou republiku připraven z Evropské unie balíček peněz v objemu asi 750 mld. Kč. Česká republika neměla dosud příležitost obdržet z Evropské unie takové množství finančních prostředků a nepředpokládá se, že se tato možnost bude opakovat v obdobích následujících. Nyní stojíme na počátku roku 2014, v závěrečné fázi tohoto období, proto je čas vyhodnocovat. ROP SČ patří v České republice mezi operační programy s nejlepšími výsledky. Finanční prostředky z EU na podporu dopravy, cestovního ruchu či jiného rozvoje obcí čerpají jednotliví příjemci dotací (obce, města, Středočeský kraj, soukromé subjekty atd.) úspěšně. Z 866 schválených projektů je již 616 finančně ukončených. ROP SČ má v oblasti veřejných prostředků Rozhodnutím/Smlouvou o poskytnutí dotace pokryto již 100,5 % celkové alokace a v tomto kritériu se pohyboval na 5. pozici mezi 17 operačními programy. Žadatelům již bylo proplaceno téměř 72,3 % prostředků z celkové alokace programu, což je také 5. pozice mezi 17 operačními programy v ČR. S objemem certifikovaných prostředků 61,9 %, vzhledem k celkové alokaci OP, se ROP SČ umístil na 2. místě mezi těmito 17 operačními programy. HODNOCENÍ ŽÁDOSTÍ PO ROCE 2009 – současnost Byla zavedena důsledná kontrola hospodárnosti. Z 200 bodů hodnocení projektu je 50 (v některých výzvách 55) určeno pro hodnocení kvality rozpočtu a obvyklých cen. I v případě, že žadatel uspěje vysokým hodnocením v jiných kategoriích, než je hospodárnost, získá prostředky z ROP SČ pouze na úrovni obvyklých cen stavebních prací v ČR. Tímto postupem již ROP SČ ušetřil 714 milionů Kč (celkových způsobilých výdajů) na projektech v celkové sumě 16 300 mil. Kč (dotace EU). → European finances are of considerable help to the region A package of finances amounting to approximately CZK 750 billion was put aside for the Czech Republic for the period 2007–2013. The Czech Republic had never before had the opportunity to receive such a large amount of financing from the European Union and it is not expected that this opportunity will be repeated in subsequent periods. Now at the beginning of 2014 we stand at the final phase of that period, and therefore it is time to take stock. ROP CB boasts some of the best results of all operational programmes in the Czech Republic. EU funds for supporting transport, tourism and other development for municipalities are being successfully drawn upon by individual beneficiaries of subsidies (municipalities, towns, the Central Bohemian Region, private entities, etc.). Of 866 approved projects, 616 projects already have been financially completed. ROP CB has already 100.5% of its total allocation covered in the area of public funding covered by a Ruling on/Agreement for Provision of Subsidy, earning it 5th place amongst the 17 operational programmes. Almost 72.3% of funding from the total allocation for the programme, which is also 5th place among the 17 operational programmes in the Czech Republic, has been already paid to the applicants. With almost 62% of its total allocation in the certified financial funding is earning 2nd place among these 17 operational programmes. EVALUATION OF APPLICATIONS AFTER 2009 – present Thorough auditing of effective investment was introduced. Of the 200 project evaluation points, 50 (55 in some calls for tender) are intended for evaluation of budget quality and standard prices. Even if the applicant receives a high score in categories other than effective investment, they shall receive funds from the ROP CB only up to the level of standard prices for construction work in the Czech Republic. By using this approach, ROP CB saved CZK 714 million on projects worth a total of CZK 16,300 million (of EU subsidies). 4 → ROP Střední Čechy / ROP for Central Bohemia KONTROLA VÝBĚROVÝCH ŘÍZENÍ PO ROCE 2009 – současnost Důsledná kontrola výběrových řízení byla zavedena v poslední třetině roku 2009. Provádí ji naše právní oddělení. Soulad tendrových dokumentací se zákonem je kontrolován před výběrovým řízením, stejně tak je kontrolován vlastní průběh výběru dodavatele. Vše se děje před zahájením financování projektu, aby se možná pochybení odhalila včas, mohla být napravena a nemuselo docházet ke korekci dotace u daného projektu. Tato důsledná kontrola výběrových řízení ex ante není v českých podmínkách běžná a mezi 17 operačními programy je spíše výjimečná. NÍZKÁ CHYBOVOST V souvislosti s prověrkou evropských dotací Nejvyšší kontrolní úřad (NKÚ) v létě 2012 provedl kontrolu ROP SČ, přičemž z kontrolovaného vzorku byla vyčíslena chybovost pouhých 1,4 % (což je pod 2 % chybovostí, při které Evropská komise uděluje programům sankce). NKÚ v ROP SČ zkontroloval projekty za 545,1 mil. Kč a dílčí nedostatky shledal v hodnotě pouhých 7,6 mil. Kč. V rámci auditů operací, které provádí Pověřený auditní subjekt Ministerstva Financí (PAS), bylo za rok 2012 kontrolováno na ROP SČ 32 projektů. Chybovost zde byla vyčíslena na 0,3 %, neboť z kontrolovaného vzorku 886,9 mil. Kč, bylo shledáno pochybení u 3 projektů a celková částka nezpůsobilých výdajů byla 2,5 mil. Kč. SCRUTINY OF PROCUREMENT PROCEDURES AFTER 2009 – present Thorough scrutiny of procurement procedures was introduced in the last third of 2009. It is performed by our legal department. Compliance of tender documentation with the law is checked before launching the tender, as is the contractor selection process itself. All this occurs before project financing is launched to ensure that potential errors are revealed in time, can be corrected and so that subsidies for the project in question will have to be adjusted. Such ex-ante thorough scrutiny of procurement procedures is not common in a Czech environment and is rather the exception among the 17 operational programmes. LOW INCIDENCE OF ERRORS As part of reviewing European subsidies, the Supreme Audit Office (SAO) conducted an audit upon ROP CB in summer 2012 where the control sample showed an error rate of only 1.4% (which is below the 2% error rate at which the European Commission imposes sanctions on programmes). Within ROP CB, the SAO audited projects for CZK 545.1 million and found minor discrepancies amounting to only CZK 7.6 million. During 2012, 32 projects were examined as part of operation audits performed by the Authorised Audit Subject of the Ministry of Finance. The error rate in this case was found to be 0.3%, because from a control sample of CZK 886.9 million, errors were found in three projects and the total amount of ineligible costs was CZK 2.5 million. ROP for Central Bohemia / ROP Střední Čechy ← 5 → ROP STŘEDNÍ ČECHY V ČÍSLECH → ROP FOR CENTRAL BOHEMIA IN NUMBERS 1 1 MNOŽSTVÍ PODANÝCH A SCHVÁLENÝCH PROJEKTŮ V ROP SČ V OBDOBÍ 2007–2013 QUANTITY OF PROJECTS SUBMITTED AND APPROVED AT ROP CB DURING THE 2007–2013 PERIOD Do konce roku 2013 předložili žadatelé na Úřad Regionální rady celkem 1 863 projektů, z nichž bylo schváleno VRR k financování 866. Museli jsme odmítnout řadu kvalitních projektů z oblasti školství či městských center. Největší zájem projevili žadatelé o prioritní osu 3 – Integrovaný rozvoj území, kde Úřad zaregistroval celkem 1 008 projektů. By the end of 2013, applicants had submitted a total of 1,863 projects to the Regional Council Office of which 866 were approved for financing by the Committee of the Regional Council. We had to reject a number of high-quality projects in the field of education and urban centres. The greatest interest was shown by applicants for priority axis 3 – Integrated Territorial Development where the Office registered a total of 1,008 projects. Porovnání počtu podaných a schválených žádostí do ROP SČ za období 2007–2013. Comparison of the numbers of applications submitted to and approved by ROP CB during the 2007–2013 period Integrovaný rozvoj území Integrated Territory Development Název prioritní osy Name of Priority Axis Doprava Transport Cestovní ruch Tourism Technická pomoc Technical Assistance Celkem Total Číslo oblasti podpory Number of area of intervention 1.1 1.2 2.1 2.2 2.3 3.1 3.2 3.3 4.1 4.2 4.3 Počet podaných žádostí Number of submitted applications 310 120 159 117 74 58 373 577 58 10 7 1863 Počet schválených žádostí Number of approved applications 172 86 29 50 38 49 160 207 58 10 7 866 700 600 500 400 Počet podaných žádostí Number of submitted applications 300 200 Počet schválených žádostí Number of approved applications 100 0 1.1 1.2 Doprava Transport 2.1 2.2 Cestovní ruch Tourism 6 → ROP Střední Čechy / ROP for Central Bohemia 2.3 3.1 3.2 3.3 Integrovaný rozvoj území Integrated Territory Development 2 2HOW MUCH MONEY IS YET TO BE DRAWN PŘEHLED ČERPÁNÍ V roce 2012 byla schválena přealokace z prioritní osy 4 „Technická pomoc“, oblast podpory 4.3 „Zvýšení absorpční kapacity“ do prioritní osy 3 „Integrovaný rozvoj území“, oblast podpory 3.2 „Rozvoj měst“ o objemu 1 250 000 eur (ERDF prostředky). Díky těmto prostředkům posílila nejvíce „zatížená“ osa Integrovaného rozvoje území. V souvislosti se změnou kurzu Kč vůči euru, k němuž došlo v listopadu 2013 na základě devizových intervencí ČNB, se zvýšil objem alokovaných prostředků u všech oblastí podpory. Takto získané prostředky byly využity k vyhlášení nových výzev na sklonku roku 2013 a na začátku roku 2014. Grafy zobrazují, kolik finančních prostředků (ERDF a veřejných prostředků) bylo proplaceno z prostředků ROP SČ do 7. 1. 2014 (při kurzu 27,480 Kč/euro). In 2012, reallocation, totalling to 1,250,000 EUR (ERDF finances), from priority axis 4 “Technical Assistance”, area of intervention 4.3 “Increased Absorption Capacity” to priority axis 3 “Integrated Territorial Development”, area of inter vention 3.2 “Urban Development” was approved. These funds have boosted the most “heavily loaded” axis of the Integrated Territorial Development. There was an increase in the volume of allocated funds in all areas of interventions due to the CZK/EUR exchange rate change in November 2013 based on the CNB foreign exchange interventions. The funds obtained were used to announce new calls at the end of 2013 and at the beginning of 2014. The graphs show the amount of funds that had been drawn from ROP CB resources as at 7 January 2014 (at a rate of CZK 27.480 to EUR 1). ERDF. Čerpání z ROP Střední Čechy do konce roku 2013 (mil. Kč). ERDF. Drawing from ROP Central Bohemia by the end of 2013 (CZK mil.). ERDF (kurz: 27,480 Kč/Euro) ERDF (exchange rate: 27.480 CZK/EUR) Doprava Transport V mil. Kč In million CZK 1.1 1.2 2.1 2.2 2.3 3.1 3.2 3.3 Alokovaná částka Allocated amount 4 794,7 1 149,1 648,0 1 374,6 137,8 1 106,6 3 260,0 2 022,0 14 492,8 Proplacené prostředky Reimbursed funds 2 628,8 781,7 469,2 889,7 127,6 410,1 2 579,4 1 715,1 9 601,6 4 563,4 1 187,3 623,5 1 114,7 150,5 1 032,2 3 167,9 2 201,3 14 040,8 Vázané prostředky Blocked funds Cestovní ruch Tourism Integrovaný rozvoj území Integrated Territory Development Celkem Total 6 000 5 000 4 000 Alokovaná částka Allocated amount 3 000 Proplacené prostředky Reimbursed funds 2 000 1 000 0 1.1 1.2 Doprava Transport 2.1 2.2 Cestovní ruch Tourism 2.3 3.1 3.2 3.3 Integrovaný rozvoj území Integrated Territory Development ROP for Central Bohemia / ROP Střední Čechy ← 7 Public funding VEŘEJNÉ PROSTŘEDKY Veřejné prostředky (kurz: 27,480 Kč/Euro) Public funding (exchange rate: 27.480 CZK/EUR) Doprava Transport V mil. Kč In million CZK 1.1 1.2 2.1 2.2 2.3 3.1 3.2 3.3 Alokovaná částka Allocated amount 5 636,6 1 306,2 764,3 1 613,3 161,7 1 300,3 3 817,1 2 365,3 16 964,8 Proplacené prostředky Reimbursed funds 3 157,0 1 464,7 524,7 1 092,9 156,0 494,5 3 246,4 2 188,2 12 324,4 Vázané prostředky Blocked funds 5 590,9 1 952,8 696,4 1 395,8 186,0 1 227,5 3 994,1 2 926,5 17 970,0 Cestovní ruch Tourism Integrovaný rozvoj území Integrated Territory Development Celkem Total 6 000 5 000 4 000 Alokovaná částka Allocated amount 3 000 Proplacené prostředky Reimbursed funds 2 000 1 000 0 1.1 1.2 Doprava Transport 2.1 2.2 Cestovní ruch Tourism 8 → ROP Střední Čechy / ROP for Central Bohemia 2.3 3.1 3.2 3.3 Integrovaný rozvoj území Integrated Territory Development 3 KDO JSOU PŘÍJEMCI DOTACÍ? 3 WHO ARE THE BENEFICIARIES OF SUBSIDIES? Regionální operační program Střední Čechy je určen především na rozvoj měst a obcí ve Středočeském kraji. The Regional Operational Programme Central Bohemia is aimed primarily at the development of towns and municipalities in the Central Bohemian Region. Who are the beneficiaries of subsides? Typy žadatelů ve schválených projektech 2007–2013. Types of applicants in approved projects from 2007 to 2013. Typ příjemce Type of beneficiary Počet projektů Number of Projects Města, obce, svazky, sdružení a organizace obcí Towns, municipalities and associations of municipalities 531 Středočeský krajský úřad, organizace založené a zřízené krajem Central Bohemia Regional Authority, organisations established and run by the Region 169 Regionální rada SČ CB Regional Council 75 Soukromé subjekty – malé a střední podniky Private subjects – small and medium-sized enterprises 48 NNO, státní neziskové organizace NGO, nongovernmental organisations 38 Ostatní (např. Hospodářská komora, Provozovatel drážní dopravy atd.) Other (e. g. Chamber of Commerce, Train Operating Company, etc.) Celkem Total 5 866 ROP for Central Bohemia / ROP Střední Čechy ← 9 4 KDE SE ČERPALO NEJVÍCE? 4 WHERE WERE MOST FUNDS DRAWN UPON? Podívejme se na porovnání úspěšnosti v čerpání podle okresů v letech 2007–2013. Částky jsou uvedeny v mil. Kč. Jedná se o podíl financování z ERDF. Let us take a look at the success in drawing funds according to counties over the years 2007–2013. The amounts are in millions of CZK. This is the part of financing from the ERDF. Čerpání a počet schválených projektů dle okresů v letech 2007–2013. Drawing on the funds and number of approved projects according to counties over the years 2007–2013. Okres County objem (mil. Kč) Amount (mil.CZK) Počet projektů Number of Projects Rakovník 537,8 25 Beroun 604,2 45 Mělník 777,3 57 Nymburk 1 093,7 56 Kolín 1 039,5 56 Benešov 1 256,8 52 Příbram 1 166,3 73 Kutná Hora 1 334,0 67 Mladá Boleslav 1 793,0 76 Praha-západ 1 305,8 90 Praha-východ 1 783,8 90 Kladno 2 165,4 94 112,3 10 Praha / Prague 2 500 2 000 Objem (mil. Kč) Amount (CZK mil.) 1 500 1 000 500 10 → ROP Střední Čechy / ROP for Central Bohemia no ad ch vý a- Kl od d pa ah azá ah le sl Pr Pr M la dá tn Bo á Ho av ra m Ku íb ra v Př šo ne Be lín Ko rk bu m ní k Ny ěl M un ro Be Ra ko vn ík 0 Aktuální výzvy naleznete na našich webových stránkách: You can find the latest calls for tender on our website: www.ropstrednicechy.cz Po domluvené konzultaci nás naleznete na této adrese: Make an appointment to see us and you will find us at this address: Regionální rada regionu soudržnosti Střední Čechy – Úřad Regionální rady Regional Council for the Central Bohemia Cohesion Region – Regional Council Office Karlovo nám. 313/8, Praha 2 / Prague 2 Tel.: +420 222 749 769 – sekretariát / assistant E-mail: [email protected] V publikaci byly použity údaje z informačního systému MONIT7+ k 7. 1. 2014. Data from the MONIT7+ information system as at 7 January 2014 has been used in this publication.
Podobné dokumenty
Článek z informačního zpravodaje ROP Střední
Pan KarelPotlal<, a pied nim jeho otec Leopc[d, byti mistnimi mecen65i, podporuiicimi l
Moravskoslezský kraj - Odbor strukturálních fondů Ministerstva vnitra
Prostřednictvím některé ze šesti výzev OP LZZ, které byly vyhlášeny Ministerstvem vnitra pro územní samosprávu, čerpalo celkem
24 úřadů Moravskoslezského kraje. Nejvíce projektů se zaměřilo
na vzdě...
Jednotný programový dokument pro Cíl 2
Prvním krokem k vytvoření žádosti o podporu v aplikaci BENEFIT7 je úspěšná registrace žadatele.
V nabídce Úvod klikne uživatel v levém modrém panelu na tlačítko Registrace. Tím se mu otevře
následu...
Výroční zpráva 2008 - Regionální rada regionu soudržnosti Střední
Pokrok v prioritní ose 1 Doprava
Základním cílem prioritní osy 1 je zajištění efektivní, flexibilní a bezpečné dopravní
infrastruktury v rámci regionu SM včetně spolehlivé, kvalitní a integrované ...